人人爽人人草,欧美精品999999999999,日韩不卡不卡,日韩一区啪啪

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(guó)(山東)自由貿(mào)易試驗(yàn)區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號(hào)章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號(hào)樓 101

沼氣凈化脫硫裝置的運(yùn)行維護(hù)!

沼氣凈化裝置的運(yùn)行維護(hù)應(yīng)符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應(yīng)定期排出脫水、脫硫裝置中的領(lǐng)凝水。當(dāng)室外溫度接近0℃時(shí),應(yīng)每天排除冷凝水,排水時(shí)應(yīng)防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動(dòng)運(yùn)行正常后,應(yīng)定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應(yīng)滿足后端工藝要求。當(dāng)發(fā)現(xiàn)脫硫效率明顯下降時(shí),應(yīng)及時(shí)補(bǔ)充循環(huán)營(yíng)養(yǎng)液。塔內(nèi)填料應(yīng)6-12個(gè)月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應(yīng)定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當(dāng)達(dá)不到設(shè)計(jì)要求時(shí)應(yīng)更換脫硫劑或進(jìn)行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應(yīng)符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當(dāng)采用塔內(nèi)脫硫劑再生時(shí),應(yīng)關(guān)閉沼氣進(jìn)出口閥,打開旁通管道和放散管路閥門。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當(dāng)采用在線脫硫劑再生時(shí),應(yīng)根據(jù)沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內(nèi)溫度應(yīng)低于70℃,脫硫塔出口處沼氣中氧含量應(yīng)小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進(jìn)行2次~3次再生后應(yīng)及時(shí)更換,更換脫硫劑時(shí)操作人員應(yīng)戴防毒面具,室內(nèi)應(yīng)進(jìn)行通風(fēng);
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應(yīng)符合環(huán)境保護(hù)的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
国产精品一线二线日韩| www.AVAV久久免费福利| 欧美大屌久久久久久| 欧美极品三级日韩| 天堂在线一区| 91色婷婷欧美| 丰满少妇野战门视频| AV 在线 成人| 97caobb| 一二三在线视频不卡了| 自慰大鸡巴男网址| 日韩二区三区人妻电影| 欧美大黑屌插白逼视频| 欧美日本九九精品| 91人妻人人精| 爆操白浆无码| 夜夜V 1区| 黄色电影网站二区三区| 欧美色久精品| 综合一区二区三区日韩| 91专区视频精品| 男女大干AV| 丁香五月婷丶深爱激情| 2019年黄色片网站久久久| 加勒比免费一区二区三区| 欧美日韩综合一区二区三区四区| 国产日韩欧美中文在线| 中国超级美女大黑逼操逼视频| 尤物在线观看不卡| 日本韩国午夜福利| 亚洲少妇| 日产无码久| 久久国产精品夫妻露脸视频| 图片视频一区二区三区亚洲| 久x性色AV粉嫩av性xz| 国产精品无码三级日本老少配| 少妇一级婬片免费放播放| ssni亚洲精品在线| 欧美日韩一级黄在线| 久久精品三区四区| AV爽网站|